Verizon CEV installation in Irvine, California648 viewsWorkers preping the CEV for the concrete pour.
Verizon CEV installation in Irvine, California610 views
Light Standard Under Construction574 viewsThe double arms of this light standard, and the radome containing the antennas above the arms are yet to be placed. The light standard is located in the greenbelt median of the roadway.
Not part of an underground water river...546 viewsThe water bottle is not part of the CEV.
The Transit Mixer has Arrived...537 views...so let the pouring begin!
Don't worry...the ladder will be removed before the concrete is poured.496 viewsWorkers preping the CEV for the concrete pour. The large holes are to connect to what will be intake and outflow air vents yet to be installed.
Light Standard Under Construction496 viewsThe double arms of this light standard, and the radome containing the antennas above the arms are yet to be placed.
Looking at the rear of the CEV.475 viewsA good shot of the base and read of the CEV dig hole.
CEV ready for concrete pour473 viewsJust waiting on the transit mixer to show up.
Cable route in/out of the CEV469 viewsThis trench will house the power and telephone cable conduits into and out of the CEV, as well as the coaxial cables to the base of the light standard.
Nearly time for the 'crete!423 viewsWorkers preparing the CEV for the concrete pour.