Dr. Jonathan Kramer's Cell Tower Photo Gallery

Copyright 2000-2023 Dr. Jonathan Kramer

Image search results - "double"
DSCN8496.JPG
The Transit Mixer has Arrived...536 views...so let the pouring begin!
DSCN8495.JPG
Light Standard Under Construction493 viewsThe double arms of this light standard, and the radome containing the antennas above the arms are yet to be placed.
DSCN8492.JPG
Not part of an underground water river...544 viewsThe water bottle is not part of the CEV.
DSCN8494.JPG
CEV ready for concrete pour470 viewsJust waiting on the transit mixer to show up.
DSCN8493.JPG
Nearly time for the 'crete!419 viewsWorkers preparing the CEV for the concrete pour.
DSCN8491.JPG
Don't worry...the ladder will be removed before the concrete is poured.494 viewsWorkers preping the CEV for the concrete pour. The large holes are to connect to what will be intake and outflow air vents yet to be installed.
DSCN8490.JPG
Cable route in/out of the CEV465 viewsThis trench will house the power and telephone cable conduits into and out of the CEV, as well as the coaxial cables to the base of the light standard.
DSCN8488.JPG
Looking at the rear of the CEV.473 viewsA good shot of the base and read of the CEV dig hole.
DSCN8489.JPG
Light Standard Under Construction571 viewsThe double arms of this light standard, and the radome containing the antennas above the arms are yet to be placed. The light standard is located in the greenbelt median of the roadway.
DSCN8486.JPG
Verizon CEV installation in Irvine, California606 views
DSCN8487.JPG
Verizon CEV installation in Irvine, California645 viewsWorkers preping the CEV for the concrete pour.
 
11 files on 1 page(s)